MUSCLE WALL

Primary & secondary containment solution

"In all of my 35 years in the Oil & Gas industry, I have seen many different containment solutions. I am the most impressed and confident in Muscle Wall."

- John Robertson • Hat Creek Services, LLC

Muscle Wall vs Earthen Solutions

For years the method of choice for secondary containment has been earthen solutions. These solutions are expensive, require the use of heavy equipment, and present significant environmental concerns. Muscle Wall was engineered and designed to provide superior primary and secondary containment without the common issues that are prevalent with earthen solutions.

Time is Money & Muscle Wall Saves Both

A luxury that is not abundant on an oilfield is time. Time is money, and luckily Muscle Wall can save you both. Muscle Wall was designed to me setup and taken down in as little time as possible. The lightweight of each wall coupled with the intuitive design allows Muscle Wall to be deployed and taken down with just a small team of workers and without the aid of heavy equipment. A 2-foot secondary containment big enough to house a standard frac tank can be setup in just 30 minutes.

Lightweight Sections Tailored to your Needs

The beauty of Muscle Wall lies within its sections. By having multiple 6-foot wide sections it can be configured to meet the needs of our customers. The corner units allow for a 90-degree turn and the ability for square containments. The 22-degree range of motion at each joint allow for circular or curved containments as well as the ability to bend or curve around terrain or equipment.

"It is absolutely essential for Oil and Gas producers to have a reliable containment solution. There is no system more reliable than Muscle Wall."

Jack Belcher Energy North America

The Numbers Don't Lie

During one of our recent primary containment deployments in Hobbs, New Mexico two 25,000bbl and one 18,000bbbl containments were constructed with 4-foot Muscle Wall.

Deployment time for Muscle Wall systems:

  • 200ft x 200ft (25,000bbl) - 7 hours
  • 200ft x 170ft (18,000bbl) - 5 hours
  • 200ft x 200ft (25,000bbl) - 3.5 hours

One Piece to Replace Them All

6-inch Muscle Wall provides the customization that your job needs without the expense, hassle, or complexity of other solutions. Our 6-inch Muscle Wall was designed so that it can be used to create a:

  • 6-inch high containment
  • 1-foot high containment
  • 90-degree corner
  • drive-over containment
  • wire, hose, and/or pipe drive-over protection

Protect the Lifeline of your Site

The Muscle Wall drive-over system offers incredible protection for the lifeline of oil & gas and construction sites: data wires, hoses, and pipes. The system can be transported on and off the site in the back of a pickup truck, set up by as little as one person, and has the strength capacity to withstand the weight of anything on the road.

Don't Just Comply to Standards, Exceed Them

Muscle Wall was designed with the environment in mind. By using Muscle Wall as a secondary containment, negative impacts to the environment, such as erosion, can be greatly reduced. At Muscle Wall it is our desire to help our clients be responsible and exceed all standards in environmental regulations.

"Since our first introduction to Muscle Wall, we realized that you had brought the state of the art to an entirely new level"

- William G. Darsie • Kjeldsen, Sinnock, & Neudeck, Inc.

Recent Applications

© 2017 Muscle Wall Holdings LLC. All Rights Reserved

ManShak Marketing & Design

Request a phone call from someone on the team

Submitting Request...

The server encountered an error.

Request received.

MUSCLE WALL

Your primary & secondary containment solution

"In all of my 35 years in the Oil & Gas industry, I have seen many different containment solutions. I am the most impressed and confident in Muscle Wall."

- John Robertson • Hat Creek Services, LLC

"It is absolutely essential for Oil and Gas producers to have a reliable containment solution. There is no system more reliable than Muscle Wall."

Jack Belcher Energy North America

"Since our first introduction to Muscle Wall, we realized that you had brought the state of the art to an entirely new level"

- William G. Darsie • Kjeldsen, Sinnock, & Neudeck, Inc.

  • Hobbs, New Mexico

    Hobbs, New Mexico

    Recently in Hobbs, New Mexico Muscle Wall was used as a primary containment system in oil and gas operations  where three containment systems were fully deployed totaling 68,000bbls of containment.

  • Pecos, Texas

    Pecos, Texas

    Muscle Wall was recently deployed in Pecos, Texas where two 85,000bbl containments were fully deployed and used during oil and gas operations.

  • BK Equipment

    BK Equipment

    BK Equipment based out of Duncan Oklahoma has purchased over 2,400 linear feet of Muscle Wall and regularly uses it in oil and gas operations in the Oklahoma and Texas area.

MUSCLE WALL

Primary & secondary containment solution

"In all of my 35 years in the Oil & Gas industry, I have seen many different containment solutions. I am the most impressed and confident in Muscle Wall."

- John Robertson • Hat Creek Services, LLC

Muscle Wall vs Earthen Solutions

For years the method of choice for secondary containment has been earthen solutions. These solutions are expensive, require the use of heavy equipment, and present significant environmental concerns. Muscle Wall was engineered and designed to provide superior primary and secondary containment without the common issues that are prevalent with earthen solutions.

Time is Money & Muscle Wall Saves Both

A luxury that is not abundant on an oilfield is time. Time is money, and luckily Muscle Wall can save you both. Muscle Wall was designed to me setup and taken down in as little time as possible. The lightweight of each wall coupled with the intuitive design allows Muscle Wall to be deployed and taken down with just a small team of workers and without the aid of heavy equipment. A 2-foot secondary containment big enough to house a standard frac tank can be setup in just 30 minutes.

Lightweight Sections Tailored to your Needs

The beauty of Muscle Wall lies within its sections. By having multiple 6-foot wide sections it can be configured to meet the needs of our customers. The corner units allow for a 90-degree turn and the ability for square containments. The 22-degree range of motion at each joint allow for circular or curved containments as well as the ability to bend or curve around terrain or equipment.

"It is absolutely essential for Oil and Gas producers to have a reliable containment solution. There is no system more reliable than Muscle Wall."

Jack Belcher Energy North America

The Numbers Don't Lie

During one of our recent primary containment deployments in Hobbs, New Mexico two 25,000bbl and one 18,000bbbl containments were constructed with 4-foot Muscle Wall.

Deployment time for Muscle Wall systems:

  • 200ft x 200ft (25,000bbl) - 7 hours
  • 200ft x 170ft (18,000bbl) - 5 hours
  • 200ft x 200ft (25,000bbl) - 3.5 hours

One Piece to Replace Them All

6-inch Muscle Wall provides the customization that your job needs without the expense, hassle, or complexity of other solutions. Our 6-inch Muscle Wall was designed so that it can be used to create a:

  • 6-inch high containment
  • 1-foot high containment
  • 90-degree corner
  • drive-over containment
  • wire, hose, and/or pipe drive-over protection

Protect the Lifeline of your Site

The Muscle Wall drive-over system offers incredible protection for the lifeline of oil & gas and construction sites: data wires, hoses, and pipes. The system can be transported on and off the site in the back of a pickup truck, set up by as little as one person, and has the strength capacity to withstand the weight of anything on the road.

Don't Just Comply to Standards, Exceed Them

Muscle Wall was designed with the environment in mind. By using Muscle Wall as a secondary containment, negative impacts to the environment, such as erosion, can be greatly reduced. At Muscle Wall it is our desire to help our clients be responsible and exceed all standards in environmental regulations.

"Since our first introduction to Muscle Wall, we realized that you had brought the state of the art to an entirely new level"

- William G. Darsie • Kjeldsen, Sinnock, & Neudeck, Inc.

Recent Applications

Request a phone call from someone on the team

Request a phone call from someone on the team