Blocker Energy Endorses Muscle Wall

Muscle Wall recently received a letter of endorsement from Dave George, Project Manager of Blocker Energy Services, Inc. We appreciate Mr. George’s support and have enjoyed working with him. We have included the letter below, with Dave's permission, for you to read.

Good afternoon, I wanted to take a moment and send you an e-mail thanking you for your Muscle Wall product. I have used many different types of containment systems over the years, and I must say that your Muscle Wall Containment System is the most revolutionary on the market today for the oil and gas industry. The Two Foot Muscle Wall system is not only light weight but has superior durability, and can be easily assembled and/or disassembled with speed when time is of the essence. Also, the design of this product allows for bulk loading and can be deployed in a short amount of time. Lastly and most important, the Muscle Wall gets the job done when it comes to protecting our environment by containing hazardous materials while providing a better solution to managing spills. We are currently using the Two Foot Muscle Wall System for primary and secondary containment in support of drilling and completion operations. The Muscle Wall System has proven to be very marketable and a success to our containment side of the business. Again, I would like to personally thank you from our Team here at Blocker Energy Services and look forward to many future endeavors.

 

Regards,

Dave George

Project Manager

Blocker Energy Services, Inc.

Dan Blocker Petroleum Consultants, Inc.

Request a phone call from someone on the team

Submitting Request...

The server encountered an error.

Request received.

© 2017 Muscle Wall Holdings LLC. All Rights Reserved

ManShak Marketing & Design

Request a phone call from someone on the team